Marnie Schmidt

  • About
  • Services
    • Management Team Workshop
    • Internal Audit Program Development
    • Training Program Integration
    • Corrective Action (CA) Training
    • 5S, Lean u0026#038; Six Sigma Training
    • 8-Week Boot Camp (Build A Quality System)
    • Book: u0022Tribal Knowledge-Practical use of ISO, Lean u0026 Six Sigma Togetheru0022
  • Industries
  • Coaching
  • Publications
  • Resources
  • Blog
Let’s Talk
continuous improvement ISO9001 lean quality six sigma uncategorized

ISO9001:2015 52-Wk Challenge (Wk 33) 8.3.6 Design and development changes

Marnie Schmidt
August 24, 2015

change chameleon8.3.6 Design and development changes

One thing is for certain, change happens!

This week, we’ll look at the final section of 8.3 Design and development of products and services.  8.3.6 Design and development changes.  Along with a very specific and disciplined list of required inputs, controls and outputs, we must always consider the importance of controlling changes to these as we move through the design process.

While the previous sections were wordy and repetitive, (but I think appropriately so), this section uses an economy of words to describe a very important part of the design process – dealing with change.

Change happens, and happens often.  Unfortunately, as we become more and more nimble and innovative, we can sometimes introduce difficulty when we do not adequately manage change.  As important to inputs, controls, and outputs are, any changes to these must be carefully assessed for their potential impact on other characteristics of design.

Change to documents, change to processes, change to procedures, change to policies, change to products and services are almost certainly done with the intent of improvement.  However, improvement is most often successfully achieved when these changes are carefully controlled, communicated and carefully implemented.

The requirements read, “The organization shall review, control and identify changes made to design inputs and design outputs during the design and development of products and services or subsequently, to the extent that there is no adverse impact on conformity to requirements.

Documented information on design and development changes shall be retained.”

That’s it.  Like I said, it’s very simply stated.  The most important bits of the requirement are “shall review, control and identify changes”.  And remember, there is a requirement for “documented information” as well.  So, the organization must ensure their process includes a definition of how changes are to be reviewed, controlled and identified.

Within the “controlled” requirement, it might have been nice to have included specifically the ideas of containment and transition.  A change may be satisfactorily controlled through the use of revision levels, distribution of information and communication.  But one must also not forget to include a positive containment/recall of product or services when changes are made.

For example, if a product is changed through a tool change, it is critical that any work in process be contained and decisions made about when a permanent transition will be completed.  It is too easy to forget about components up and downstream, which can result in mixing or comingling of different versions of the product or service.  This can actually create a problem short term as it attempts to improve a product long term.

THIS WEEK’S HOMEWORK

Review your design process (and again, remember to consider whether you have more than one “design” process) for the inclusion of the control of changes.  Be sure the process includes not only how the design documents and infrastructure are controlled, but also how the changed or transitioning products or services are managed as well.  Good luck!

Stay involved and engaged – SUBSCRIBE!

←Previous
Next→

Recent post

  • How COVID-19 is schooling us on “errorproofing” and lean manufacturing
    April 13, 2020
  • Was COVID-19 in your emergency response plan? No? You’re not alone.
    March 26, 2020
  • ISO9001:2015 52-Wk Challenge (Wk 51 & 52) FINAL EDITION 10 Improvement
    December 23, 2015
  • ISO9001:2015 52-Wk Challenge (Wk 49 & 50) 9.3 Management review
    December 17, 2015
  • ISO9001:2015 52-Wk Challenge (Wk 47 & 48) 9.2 (9.2.1 & 9.2.2) Internal audit
    December 11, 2015
  • ISO9001:2015 52-Wk Challenge (Wk 46) 9.1.2 Customer satisfaction, 9.1.3 Analysis and evaluation
    December 6, 2015

Tags

Categories

  • bobschmidt
  • continuous improvement
  • COVID19
  • ISO9001
  • lean
  • processes
  • quality
  • six sigma
  • uncategorized

Pages

About Us

Home

Contact Us

Gallery

Informations

Shipping Policy

Returns & Funds

Cookies Policy

Frequently asked

Links

About Us

Privacy Policy

Terms & Conditions

Contact Us